Nimbus Engineering were instructed to firstly produce a Discharge of the planning condition relating to SuDS and surface water, then develop a surface and Foul Water Drainage design in sufficient detail to allow construction on site.
Nimbus Engineering were instructed to firstly produce a Discharge of the planning condition relating to SuDS and surface water, then develop a surface and Foul Water Drainage design in sufficient detail to allow construction on site.
