Projects
Discover the work we have been doing at Nimbus Engineering Consultants through our range of case studies from the residential, commercial, and industrial sectors.
-
Flood Risk Assessment & SuDS Report – Carpenters Court, Uxbridge
Lead Local Flood Authority: London Borough of Hillingdon Services Provided: Flood Risk Assessment and SuDS Report, SuDS Report to discharge planning conditions, and Below Ground Drainage Design for Building Regulations approval and construction Nimbus Engineering was commissioned by Kearns Development Ltd to prepare a Flood Risk Assessment (FRA) and SuDS report to support a planning application for a proposed development... -
Flood Risk Assessment and SuDS Report in Croydon – London Borough of Croydon
Are you seeking a professional Flood Risk Assessment in Croydon or a SuDS report for planning applications in the London Borough of Croydon? At Nimbus Engineering, we specialise in producing Flood Risk Assessments and Drainage Strategy Reports tailored to the specific planning requirements of Croydon Council. We have successfully completed hundreds of Flood Risk Assessments (FRA) and Sustainable Drainage System... -
Flood Risk Assessment & Drainage Strategy Report, Tokar
Nimbus Engineering Consultants was commissioned by Tokar Limited, with Derek Page as the primary contact, to provide a Flood Risk Assessment and Drainage Strategy report to support their planning application and deliver a comprehensive drainage solution for a proposed church development in Walberton. This project demanded expertise in both foul and... -
SuDS Report/SuDS Assessment, London Borough of Sutton
At Nimbus Engineering, we produce many SuDS reports to support planning applications for the London Borough of Sutton. Completing a minimum of one SuDS report every few days, we understand the London Borough of Sutton's requirements very well. We also know the area’s key characteristics, such as the drainage network and... -
Drainage Investigation, Design and CCTV Drainage Survey, Juniper Way, Hayes
We were commissioned in November 2023 to assist with planning and designing a development project involving the demolition of garages and the construction of two new dwellings. Because of the presence of several manholes on the site, it was crucial to conduct a thorough investigation to assess if they were still... -
Below Ground Surface & Foul Water Drainage Design, The Cloud House
PROJECT OVERVIEW Nimbus Engineering Consultants were appointed to provide a Below Ground Foul and Surface Water Drainage Design for The Cloud House. The London Borough of Camden granted planning permission for the proposed development, consisting of a pair of new semi-detached houses. Peter Morris Architects created a joyful design to bring an “element of fun” to... -
Flood Risk Assessment and SuDS Report for The Old Police Station Project, Uxbridge
Table of Contents Introduction Project Overview Flood Risk Assessment and SuDS Strategy Discharging Planning Conditions Below Ground Drainage Design Collaboration and Project Management Conclusion and Further Assistance Introduction We were commissioned by Kearns Development Ltd to provide a Flood Risk Assessment and SuDS strategy report in order to support their planning application for their proposed gated development of 53... -
Chippendale Way, Uxbridge
We were contacted to support the planning application of a four-storey block of apartments, with associated car parking and landscaping at Chippendale Way, Uxbridge. -
Poppy Close, West Drayton
Nimbus Engineering Consultants Ltd were appointed by Kearns Premier Homes to assess and provide a solution on the management of Surface Water runoff at the proposed residential development at a Former British Legion Site. -
Former Police Station at West Drayton
This site was regenerated in to a residential development with an underground car park. Nimbus Engineering were instructed to provide the SUDS and Foul Water Network design. -
Holden Road
Nimbus Engineering were instructed to firstly produce a Discharge of the planning condition relating to SuDS and surface water, then develop a surface and Foul Water Drainage design in sufficient detail to allow construction on site. -
SKLPC Community Centre
Nimbus Engineering were instructed by SKLPC community to provide an outline drainage strategy for the development proposals, including SuDs.
“We at ERS have used Nimbus Engineering many times over the years and have always found their service efficient and professional. I recommend them without hesitation.”
Ali Mohammad, Director
ERS Consultants Ltd
"You guys have been brilliant from start to finish - I also wanted to pass on my thanks to Adam again, great guy, super knowledgeable and was happy to explain everything to us which was appreciated. He left the field looking as if he hadn’t been there so again, appreciated!"
Alistair Mykura
Client
“I have worked with Nimbus Engineering for many years. I can always count on them to deliver comprehensive flood risk assessments, drainage strategy and SuDS reports, on time and at a competitive price. More importantly, I can’t think of a single occasion where a council has not accepted the report’s recommendations.”
Andy Hollins, Director
Hollins Planning
“I, George Christodoulou am very happy with the work Nimbus have carried out for me over
the last 10 years. They always deliver a good service at a very good price and always high
quality reports and fast turn around. They have carried out work on many of my projects in
Croydon and I have never had a problem with their work. I will continue to use them as
I am expanding my business now. And would highly recommend them to other developers.”
George Christodoulou, Director
Infinity Homes and Developments
“We have worked with Nimbus for a number of years and always found them to be highly
professional and quick to respond and carry out new work. We have no hesitation in
recommending them for future projects.”
Emily Hall, Senior Planner
WS Planning & Architecture
“I have really enjoyed working with Nimbus. Sadia is extremely knowledgeable and is always willing to go out to her way to help clients. The speed at which Nimbus produce their work is impressive and the prices are extremely competitive. Special mention to Ryan Herity after we worked closely together on a couple of schemes. Always happy to pick up the phone andanswer questions. He provided solutions that led to drainage officer approvals – you can’t ask any more than that!”
John Neville
Elegant Homes
“I have used Nimbus Engineering Consultants for several years now. The service is second
to none. Sadia effectively communicates throughout the entire process. Nimbus has never let me down. I would wholeheartedly recommend Nimbus for any and all SuDS advice. Nimbus shoot from the hip, and make my life easy, knowing if I have engaged them, I do not have to ever worry.”
Luke
Design Doctor
“I have used Nimbus Engineering for a number of projects over the last 10 years and have always found them to be flexible, highly skilled and great value for money. Anyone looking for Flood Risk and/or Sustainable Urban Drainage System advice need look no further, Nimbus have the solution”
Derek GC White
Sustainability Consultant
“I would say that I have used Nimbus on several occasions for small developments to clear Planning Conditions relating to SuDs and other drainage issues. They have always been
very prompt and professional in their approach to provide the necessary reports required by
the Local Authority Planning Departments. I would not hesitate to use them again or
recommend them to anyone else.”
Clive Milburn
Milburn Designs
We're always on hand to answer your questions.
Get in touch to discuss your project
by filling out our form below.
