Lead Local Flood Authority: London Borough of Hillingdon Services Provided: Flood Risk Assessment and SuDS Report, SuDS Report to discharge planning conditions, and Below Ground Drainage Design for Building Regulations approval and construction Nimbus Engineering was commissioned by Kearns Development Ltd to prepare a Flood Risk Assessment (FRA) and SuDS report to support
Are you seeking a professional Flood Risk Assessment in Croydon or a SuDS report for planning applications in the London Borough of Croydon? At Nimbus Engineering, we specialise in producing Flood Risk Assessments and Drainage Strategy Reports tailored to the specific planning requirements of Croydon Council. We have successfully completed hundreds
Nimbus Engineering Consultants was commissioned by Tokar Limited, with Derek Page as the primary contact, to provide a Flood Risk Assessment and Drainage Strategy report to support their planning application and deliver a comprehensive drainage solution for a proposed church development in Walberton. This project
At Nimbus Engineering, we produce many SuDS reports to support planning applications for the London Borough of Sutton. Completing a minimum of one SuDS report every few days, we understand the London Borough of Sutton's requirements very well. We also know the area’s key characteristics,
We were commissioned in November 2023 to assist with planning and designing a development project involving the demolition of garages and the construction of two new dwellings. Because of the presence of several manholes on the site, it was crucial to conduct a thorough investigation
PROJECT OVERVIEW Nimbus Engineering Consultants were appointed to provide a Below Ground Foul and Surface Water Drainage Design for The Cloud House. The London Borough of Camden granted planning permission for the proposed development, consisting of a pair of new semi-detached houses. Peter Morris Architects created a
Table of Contents Introduction Project Overview Flood Risk Assessment and SuDS Strategy Discharging Planning Conditions Below Ground Drainage Design Collaboration and Project Management Conclusion and Further Assistance INTRODUCTION We were commissioned by Kearns Development Ltd to provide a Flood Risk Assessment and SuDS strategy report
We were contacted to support the planning application of a four-storey block of apartments, with associated car parking and landscaping at Chippendale Way, Uxbridge.
Nimbus Engineering Consultants Ltd were appointed by Kearns Premier Homes to assess and provide a solution on the management of Surface Water runoff at the proposed residential development at a Former British Legion Site.
This site was regenerated in to a residential development with an underground car park. Nimbus Engineering were instructed to provide the SUDS and Foul Water Network design.