Table of Contents Introduction Project Overview Flood Risk Assessment and SuDS Strategy Discharging Planning Conditions Below Ground Drainage Design Collaboration and Project Management Conclusion and Further Assistance Introduction We were…
Table of Contents Introduction Project Overview Flood Risk Assessment and SuDS Strategy Discharging Planning Conditions Below Ground Drainage Design Collaboration and Project Management Conclusion and Further Assistance Introduction We were…
We were contacted to support the planning application of a four-storey block of apartments, with associated car parking and landscaping at Chippendale Way, Uxbridge.
Nimbus Engineering Consultants Ltd were appointed by Kearns Premier Homes to assess and provide a solution on the management of Surface Water runoff at the proposed residential development at a…
This site was regenerated in to a residential development with an underground car park. Nimbus Engineering were instructed to provide the SUDS and Foul Water Network design.
Nimbus Engineering were instructed to firstly produce a Discharge of the planning condition relating to SuDS and surface water, then develop a surface and Foul Water Drainage design in sufficient…
Nimbus Engineering were instructed by SKLPC community to provide an outline drainage strategy for the development proposals, including SuDs.