1 05, 2026

BRE365 Infiltration/Percolation Testing for SuDS

By |2026-05-01T17:49:22+00:00May 1st, 2026|News Archives|

Why Do I Need a BRE365 Infiltration Test?

In accordance with the drainage hierarchy, Sustainable Urban Drainage Systems (SuDS) prioritise the disposal of surface water runoff to ground via infiltration. This approach replicates natural drainage processes and is often […]

29 04, 2026

SuDS Report & Drainage Strategy for Planning Application – London Borough of Ealing

By |2026-06-12T09:15:48+00:00April 29th, 2026|Project Archives|

Securing planning permission in London requires a proactive approach to surface water management. Nimbus Engineering recently partnered with a client in the London Borough of Ealing to deliver a fully compliant drainage solution, ensuring their residential development met all local […]

29 04, 2026

SuDS Report & Design for 100kW Ground Mounted Solar Array (ALT Solar Ltd)

By |2026-06-12T09:24:56+00:00April 29th, 2026|Project Archives|

Securing planning condition discharge for renewable energy projects requires precise surface water management. Nimbus Engineering recently worked with ALT Solar Ltd in West Berkshire to deliver a fully compliant SuDS design and infiltration testing, ensuring their ground-mounted solar array met […]

27 03, 2026

Flood Risk Assessment & SuDS Report: Haringey Borough Council

By |2026-06-12T09:27:25+00:00March 27th, 2026|Project Archives|

Securing planning permission for major commercial developments in London requires a robust approach to flood risk and surface water management. Nimbus Engineering partnered with SM Planning and Herts Heritage Building and Roofing Ltd to deliver a comprehensive Flood Risk Assessment […]

27 02, 2026

SuDS Design & Drainage Strategy for 9-Unit Residential Development – Enfield

By |2026-06-12T09:34:27+00:00February 27th, 2026|Project Archives|

Discharging planning conditions for high-density residential redevelopments requires innovative and space-efficient drainage solutions. Nimbus Engineering recently partnered with Jet Developments to deliver a comprehensive SuDS Design and Report, successfully discharging surface water conditions for a new 9-flat residential block in […]

25 02, 2026

SuDS Report to Support the planning application at Three Acres, Horley,

By |2026-06-12T09:31:50+00:00February 25th, 2026|Project Archives|

Navigating planning requirements for multi-unit residential developments requires a precise surface water management strategy. Nimbus Engineering recently worked with a client in Horley, Surrey, to deliver a comprehensive SuDS Report and drainage design, successfully securing outline planning permission for a […]

12 02, 2026

SuDS Report, Land at Hedges, Roydon

By |2026-06-04T13:39:54+00:00February 12th, 2026|Project Archives|

SuDS Report, Land at Hedges, Roydon, Essex

Lead Local Flood Authority: Epping Forest District Council

Further services provided: BRE365 Percolation Test / BRE365 Infiltration Test

Nimbus Engineering Consultants Ltd were commissioned by Construct Land & Homes (Roydon) Ltd to provide a SuDS Report […]

27 01, 2026

SuDS Report/Assessment – London Borough of Waltham Forest

By |2026-02-07T12:09:10+00:00January 27th, 2026|Project Archives|

Flood Risk Assessment and SuDS Report – London Borough of Waltham Forest

Lead Local Flood Authority: Waltham Forest Council

Further services provided: SuDS Report to discharge planning conditions, and Below Ground Drainage Design for Building Regulations approval and construction

[…]

18 01, 2026

SuDS Requirements in the UK: What Local Authorities Expect

By |2026-06-15T20:37:47+00:00January 18th, 2026|News Archives|

Sustainable Drainage Systems (SuDS) are no longer optional — they’re a planning requirement for many new developments across the UK. But the rules aren’t always straightforward. Local authorities interpret guidance differently, and expectations can vary depending on site […]

Go to Top