SuDS Report to Support the planning application for the construction of 22 dwellings, at Three Acres, Horley,

SuDS Report and Assessment: Surrey County Council

Further Services provided: BRE365 Infiltration test/Percolation test, Site walkover and liaison with client to provide ditch condition survey

SuDS Report for Proposed 22-Dwelling Residential Development

Nimbus Engineering Consultants were commissioned by Christine Muir in order to provide a SuDS Report and SuDS Assessment for her proposed development of 22 dwellings, with associated landscaping areas and roads.

We were initially asked to look at the feasibility of infiltration at the site, and carried out BRE365 Infiltration testing in order to ascertain the feasibility of source control methods of SuDS.

Unfortunately infiltration was not a viable option at this site, however due to the presence of a ditch at the site, we were able to find a suitable means of surface water disposal from the site.

Due to the depth of the ditch being fairly shallow, we had to ensure that gravity discharge was viable, and therefore carried out our levels assessment from this ditch to make sure all upstream SuDS assets were also shallow enough to make this viable.

We ensured that a level of treatment was provided for all of the surface water run off via a combination of raingarden planters, raingardens and filter drains, prior to attenuation in two large attenuation tanks.

This was followed by final storage and treatment in a large raingarden, prior to discharge to the adjacent ditch, via gravity at the required Greenfield rate.

Nimbus Engineering specialises in producing planning-ready SuDS Reports, Drainage Strategies and Flood Risk Assessments across the UK.

If you require a SuDS Report for a residential development, commercial site or planning application, contact Nimbus Engineering Consultants for professional, compliant and cost-effective drainage design solutions.

Christine was a joy to deal with and has kindly provided, the following testimonial.

‘Sadia and her team responded quickly with diligence when time was of the essence due to Council deadlines. leading to a successful result in gaining Outline planning permission.! would not hesitate in coming back to Nimbus in the future’

Share This Story, Choose Your Platform!

Leave A Comment